> Design verification
·          Increased requirements for insulating materials  and transient overvoltages withstand tests.
·          Temperature rise verification:
ü  Verification  by test of each functional unit loaded alone with its rated current
ü  Clear  methods for the selection of representative samples of an Assembly system to be  tested
ü  Test  done in 4 steps: individual functional units, main and distribution busbars,  and complete 
Assembly
ü  Heating  resistors only allowed to simulate circuits adjacent to a circuit under test
ü  Possible  verification by comparison with a tested design under strict conditions,  including derating
ü  Exemption  of test (calculation) only allowed up to 1600 A instead of 3150 A under strict  conditions, 
including a  20% derating. 
·          Possible short-cricuit withstand verification by  comparison with a tested design under strict 
condition
·          200 operating cycles instead of 50 for locking,  interlocking and withdrawable parts
·          Lifting test (from IEC 62208)
·          Corrosion resistance test for metallic parts  (from IEC 62208).
> Routine verification
ü  More  detailed list of the verifications
ü  More  severe requirements for clearances
SCHNEIDER ELECTRIC